Petersen Aluminum Corp. CAD DetailsSearch using keywords: metal balconies
Curb
Eave - Option 1 - Drip Edge
Eave - Option 2 - Retainer Clip
Expansion Joint - Fixed
Expansion Joint - Floating
Gable - Option 1 - Drip Edge - Floating
Gable - Option 2 - Z-Channel Fixed
Gable - Option 3 - J Channel - Floating
Gable - Option 4 - J Channel Turn Down - Floating
Gable - Option 5 - Floating Rake Angle
Gutter - Option 1 - No Flange
Gutter - Option 2 - With Flange
Gutter - With Flange - Over Flush Wall Panel
Gutter - With Flange - Over Standing Seam Wall Panel
Headwall - Option 1 - 2-Piece Reglet
Headwall - Option 2 - 1-Piece Reglet
Headwall - Option 3 - Counterflashing
Hip-Ridge
Installation - Coverboard
Installation - Nailbase/ISO
Installation - With Bearing Plate
Panel End
Peak - Option 1 - 1/2 Ridge - High Peak Side
Pipe Penetration - Option 1 - Fixed
Pipe Penetration - Option 2 - At Panel Rib - Fixed
Pipe Penetration - Option 3 - Floating
Rakewall - Option 1 - 2-Piece Reglet - Floating
Rakewall - Option 2 - 1-Piece Reglet - Floating
Rakewall - Option 3 - Counterflashing - Floating
Rakewall - Option 4 - Z-Closure - Fixed
Slope Change - Option 1
Slope Change - Option 2
Transition from Membrane
Transition to Membrane
Valley - Option 1 - With Diverter
Valley - Option 2 - No Diverter
Valley - Option 3 - With Hemmed Flashing
Valleywall
Z-Closure Detail
Curb
Eave - Option 1 - Drip Edge
Eave - Option 2 - Retainer Clip
Expansion Joint - Fixed
Expansion Joint - Floating
Gable - Option 1 - Drip Edge - Floating
Gable - Option 2 - Z-Channel Fixed
Gable - Option 3 - J Channel - Floating
Gable - Option 4 - J Channel Turn Down - Floating
Gable - Option 5 - Floating Rake Angle
Gutter - Option 1 - No Flange
Gutter - Option 2 - With Flange
Gutter - With Flange - Over Flush Wall Panel
Gutter - With Flange - Over Standing Seam Wall Panel
Headwall - Option 1 - 2-Piece Reglet
Headwall - Option 2 - 1-Piece Reglet
Headwall - Option 3 - Counterflashing
Hip-Ridge
Installation
Panel End
Peak - Option 1 - 1/2 Ridge High Peak Side
Peak - Option 2 - 1/2 Ridge High Peak Side - Vented
Pipe Penetration - Option 1 - Fixed
Pipe Penetration - Option 2 - At Panel Rib - Fixed
Pipe Penetration - Option 3 - Floating
Rakewall - Option 1 - 2-Piece Reglet - Floating
Rakewall - Option 2 - 1-Piece Reglet - Floating
Rakewall - Option 3 - Counterflashing - Floating
Rakewall - Option 4 - Z-Closure - Fixed
Slope Change - Option 1
Slope Change - Option 2
Transition from Membrane
Transition to Membrane
Valley - Option 1 - With Diverter
Valley - Option 2 - No Diverter
Valley - Option 3 - With Hemmed Flashing
Valleywall - With Hemmed Flashing
Vented Ridge - Option 1 - Perforated Component
Vented Ridge - Option 2 - No Support Z
Vented Ridge - Option 3 - Cor-A-Vent
Z-Closure Detail
